Klamflex On-Site
Yanbu III Desalination Plant-Saudi Arabia, 2018
Client: Marafiq
Contractor: Archirodon
Total order value: $1.1M
Products: Dismantling Joints and Dedicated Flange Adaptors.
Sizes: DN1000, DN1500, DN1700, DN2300, DN2400, DN2500, DN2700, DN2800
Pressures: PN10, PN16
Coating System: Glass Flake Epoxy




Mega Reservoir - Qatar, 2015-2019
Client: Kahramaa (Qatar General Electricity and Water Corporation)
Contractors: HBK, HLG, CCC, BOOM, Bin Omran, China Harbor)
Total order value: $15M
Products: Dedicated Couplings
Sizes: DN1800, DN2000, DN2200, DN2400
Pressures: PN16
Coating System: FBE 500 Microns, Jet Black










Strategic Enhancement Programme STEP project -UAE, 2017
Client: ADSSC (Abu Dhabi Sewerage Services Company)
Contractors: Passavant / Drake & Skull
Total order value: $1M
Products: Dismantling Joints, Dedicated Flange Adaptors
Sizes: DN900, DN1200, DN1400, DN2000
Pressures: PN16
Coating System: FBE 300 Microns, Jet Black





SE167-Kuwait, 2017
Client: MEW (Ministry of Electricity and Water)
Contractors: Al Kharafi International
Products: Dismantling Joints
Sizes: DN250, DN300, DN500, DN600, DN800, DN1600
Pressures: PN16
Coating System: FBE 300 Microns, Jet Black

Jabal Akhdar- Oman, 2017
Client: PAEW (Public Authority of Electricity and Water)
Contractors: Gulfar
Products: Dismantling Joints and Dedicated Flange Adaptors
Sizes: DN150, DN200, DN300, DN400, DN600, DN800, DN900, DN1000, DN1100, DN1500, DN1800
Pressures: PN16, PN25, PN40, PN63
Coating System: FBE 300 Microns, Jet Black

D-Line Pipeline
End User: Ashghal
Build Period: 2019-2021
Country of installation: Qatar
Order Value: €1M
Field of application: Sewer and storm water
Klamflex Milestone:
D-Line Pipeline offered Klamflex a key opportunity to introduce a new product range, (Large Bore Restrained Fittings) within a large scale project.





Batinah Pumping Station and Transmission Pipeline
End User: Public Authority Of Water
Build Period: 2019-2022
Country of installation: Oman
Order Value: €600K
Field of application: Potable Water
Klamflex Milestone:
The project involves a 160Km Transmission Pipeline between Batinah IWPP to North/South Batinah Governorate and its Pumping Station.

MIRFA C
End User: TRANSCO
Build Period: 2019-2021
Country of installation: United Arab Emirates
Order Value: €150K
Field of application: Potable Water
Klamflex Milestone:
Mirfa C offered Klamflex a key opportunity to introduce a new product range, (Large Bore, High Pressure Fittings), DN800, PN40.


IASTW IIIA
End User: Ashghal
Build Period: 2019-2020
Country of installation: Qatar
Order Value: €200K
Field of application: Sewage Treatment
Klamflex Milestone:
IASTW IIIA offered Klamflex a key opportunity to introduce products which are suited for High Temperature application in STP’s.

Dukhan Pipeline
End User: Ashghal
Build Period: 2020-2021
Country of installation: Qatar
Order Value: €750K
Field of application: 35Km TSE transmission pipeline
Klamflex Milestone:
Klamflex were awarded the project as a re-occurring order based on the previous D-Line Pipeline project, and boasts a large number of Gripper Couplings and Gripper Flange Adaptors.

Catchment Zone
End User: Ashghal
Build Period: 2020-2022
Country of installation: Qatar
Order Value: €200K
Field of application: Storm water and Sewer
Klamflex Milestone:
Klamflex were awarded the project as a re-occurring order based on the previous D-Line Pipeline project, and boasts a large number of Gripper Couplings and Gripper Flange Adaptors.

Sharqiya
End User: PAEW
Build Period: 2021-2022
Country of installation: Qatar
Order Value: €400K
Field of application: Storm water and Sewer
Klamflex Milestone:
Klamflex were awarded the project as a re-occurring order based on the previous D-Line Pipeline project, and boasts a large number of Gripper Couplings and Gripper Flange Adaptors.

Princess Elizabeth Dry Docks – East London
End User: Transnet National Ports Authority
Build Period: 2018-2020
Country of installation: South Africa
Order Value: R1.5M
Field of application: Seawater
Klamflex Milestone:
Klamflex manufactured and supplied 2 x DN1200 PN10 Dismantling Joints, as well as 2 x DN1200 PN10 Flange Adaptors which were installed alongside the 2 x DN1200 PN10 Metal Seated Wedge Gate Valves to serve as the replacement of the existing inlet valves to the Dry Dock.
The 75-year-old valve and pipeline systems posed many challenges for both manufacture and installation of equipment, however were safely negated with the use of the Klamflex fittings installed at critical points in line.